Project Gallery
Elmendorf Air Force Base - Fuel Cell / Corrosion Control Complex
Construction of a 54,570 sq. ft. “Fuel Cell/Corrosion Control Complex” consisting of a concrete foundation, masonry administration area with elevated slabs, structural steel hanger structure with metal insulated wall panels, PVC roof, mechanical, electrical, fire suppression including High Expansion Foam (HEF) system and a hanger door with 300 foot span. Building fixtures included a paint booth, a bead blast booth and a fully operational metal fabrication shop.